Location: Sacramento, CA
Duration: Project in progress. Post-construction photos to follow after completion.
Two phase project for the existing Radiology department on the first floor of the Pavilion Building. Phase 1 is a TI of an existing shell space to accommodate a new staff break room, relocated offices, ultrasound exam room with new patient toilet, and a clean utility and storage room.
Phase 2 is a build out of an existing space in a functioning and high volume Radiology department for a new MRI suite including control room and equipment room. The MRI equipment is the Siemen’s Skyra 3.0T, a top of the line 70cm open bore MRI. This also includes the creation of a new staff lounge and ADA upgrades to existing restrooms within the department.