Location: Sacramento, CA
Duration: 6 months
Critical to facility operations, the automatic transfer switches supply emergency power to the South Wing of the hospital. Streamline Construction was responsible for making sure that the existing, failing ATS was replaced in a a safe and timely matter, ensuring the safety and care of the hospital’s patients without interruption to electrical power.
Working closely with the facility was instrumental in maximizing overall project effectiveness. The photos below are of the job in-progress with conduit runs and the ATS staged to be put in place.